Equipment pads provide stable concrete foundations for HVAC units, generators, transformers, compressors, and industrial machinery at commercial and industrial facilities throughout Greenville, TX. As a general contractor, we construct reinforced equipment pads engineered for specific equipment loads serving property owners and businesses installing mechanical and electrical systems.
Equipment pad construction requires understanding load requirements, vibration isolation needs, and proper elevation for drainage and equipment clearance. We work from mechanical and electrical drawings to construct pads at specified dimensions, elevations, and locations. Pad designs typically include reinforced concrete (6-12 inches thick), anchor bolt installation, and sometimes housekeeping pads with curbs containing fluid leaks.
The construction process involves excavation, aggregate base installation, formwork, reinforcement placement, anchor bolt template installation, concrete placement, finishing, and anchor bolt verification. We coordinate pad locations with utility connections, access requirements, and mechanical contractor schedules. For rooftop equipment, we coordinate pad construction with structural requirements and crane access.
As your general contractor for equipment pad work, we manage all phases including engineering plan review, layout survey, excavation, pad construction, anchor bolt installation and verification, and coordination with mechanical and electrical contractors. We deliver pads ready for equipment installation on schedule.